Installing a weighbridge can be a complicated process that requires a team of experienced professionals. However, here are the general steps:
1. Site preparation: Choose a level site with adequate drainage and enough space for the weighbridge. Clear the area of obstacles and debris.
2. Foundation preparation: Dig holes for concrete piers at predetermined locations and depths. Install reinforcement steel cages and pour concrete into the holes. Level the surface of the piers.
3. Mounting the load cells: Place the load cells on top of the concrete piers, making sure each cell is properly oriented and oriented in the same direction.
4. Installing the weighbridge platforms: Use a crane or lift to place the weighbridge platforms onto the load cells. Install the connection rods between the platforms and load cells.
5. Wiring and electrical connections: Connect the load cells and summing box. Connect the control system and cables to the indicators and displays.
6. Calibration and testing: Test the weighbridge system to ensure it is working correctly, and calibrate it before using it.
It is always best to seek the help of a professional weighbridge installer to ensure the accuracy and safety of the system.
Post time: May-04-2023